The single-use L6 sensors are factory calibrated and easy to use. Unlike reusable probes, the L6 sensors never need recalibration. At some point, the slab will be dry enough to receive the floor covering. Of course, this is an unpredictable process and because of that schedules can slip and costs can mount up. If you go this route make sure you choose a high-quality product that will adequately seal the moisture into the slab.
Shop Rapid RH L6. The only way to know if a concrete slab is dry is to test it. The most accurate test for doing this is the in situ relative humidity test. Data logging throughout the drying process allows you to detect drying problems early, correct them, and will aid you to determine what is responsible for slow drying.
This protects you from liability. Trend analysis helps you make accurate projections and create tighter schedules. This saves you both time and money. Concrete drying time is a major factor in the schedule of most construction projects and when you shorten that time, you save money.
The best approach for decorative concrete is to try to alter conditions so you don't need to do initial curing: block the wind, keep the sun off the concrete, get cooler concrete. If that's not possible, fogging just enough to keep the surface damp is possible, but the simplest approach is to use evaporation retardant. This chemical can be sprayed on to form a thin membrane on the surface that prevents the water from evaporating.
It completely dissipates during finishing operations. Keep some of this around for dry windy conditions. After concrete is placed, the concrete increases in strength very quickly for a period of days. Water curing can be done after the slab pour by building dams with soil around the house and flooding the slab.
The enclosed area is continually flooded with water. Ideally, the slab could be water cured for 7 days. Consider planning your job to pour at the end of the week, build berms, then flood over the weekend. You get the benefit of water curing without losing too much time in the schedule. Get Job Leads Today! About Us Free Newsletters. Scofield Co. Great for interior and exterior.
Leaves no topical residue. Industra-Seal A Protects and fortifies concrete against moisture damage. Easily applied with spray equipment. At this point, it usually ready for people to walk on.
In addition to the particulars of the concrete mix, there are a number of other factors that influence how long Quikrete takes to dry. Temperature is a major factor to consider when mixing and pouring concrete.
The hotter it is outside, the faster your concrete will dry. Alternatively, the colder it is out there, the longer the drying process will take. Varying temperatures can have a major effect on the final product. High levels of heat not only cause faster drying but can also cause the concrete to dehydrate , which leads to a weaker final product. Because of this, in the hotter summer months, mixing and pouring concrete early in the morning or late in the afternoon makes sense.
This will ensure the chemical reaction takes place at the right temp, and the concrete has dried significantly by the time the mid-day sun hits. While many factors play a role in the curing process, outside conditions, water content, and mix type play the largest roles in curing. Withstanding extreme conditions, most concrete is ready for foot traffic within 24 hours, vehicle traffic within 48 hours, and all other needs within 30 days.
Factors in Concrete Curing Time. While the above factors can add or subtract a few hours from curing and drying time generally:. Most new concrete pours can handle foot traffic in about 24 hours.
Most new concrete pours can handle vehicle traffic in 48 hours. Using a Professional for New Concrete. Related Posts. Concrete Curb and Gutter Replacement. May 5th, 0 Comments.